1,331
edits
(Finished information in article - did process section) |
(→Submissions: Added followup submissions) |
||
Line 32: | Line 32: | ||
==Submissions== | ==Submissions== | ||
Over 130 submissions were made in the preliminary phase from 13 February to 13 March 2019.<ref name="VECBoroondaraWebsite" /> | Over 130 submissions were made in the preliminary phase from 13 February to 13 March 2019. 206 were received following the release of the draft report.<ref name="VECBoroondaraWebsite" /> | ||
==References== | ==References== |